Update 5-06-2025.
The road is open from the Valtellina side from 10:00 am on 4-06-2025. The section between locality S.Apollonia (BS) and the pass will open to traffic on 6-06-25 at 10:00 am.
We remind the clientele that the Bonetta Refuge at Gavia Pass is open.
The opening date for 2025 of the SS300 of the Gavia Pass in the section between the locality of Santa Apollonia in the municipality of Ponte di Legno and the locality of Plaghera in the municipality of Valfurva originally planned for May 31, 2025 could not be met.
